Trip Generation for a Development
Easytrip generation
A development has 200 units and a trip-generation rate of 0.8 trips per unit for the analysis period. How many trips are generated during that period?
- A80 trips
- B160 trips
- C200 trips
- D250 trips
Show solutionHide solution
Answer: B. 160 trips
Trips = rate × number of units = 0.8 × 200 = 160 trips for the stated analysis period.
Practice this deckUntimed, one problem at a time, with your progress saved.
Related problems
- Stopping Sight Distance on a Level Road · Transportation
- Traffic Flow Rate from Density and Speed · Transportation
- Lane Flow Rate from Time Headway · Transportation
