Owner Contracts in Design-Bid-Build

Easyproject deliverycontracts
On a design–bid–build project, which parties hold contracts with the owner?
  1. AOnly the contractor
  2. BThe engineer and the contractor, separately
  3. COnly the engineer; the engineer then hires the contractor
  4. DA single design–builder
Show solution

Answer: B. The engineer and the contractor, separately

Rule: in design–bid–build the owner signs two separate contracts, one with the engineer (design) and one with the contractor (construction). The engineer and contractor have no contract with each other. A single contract with a design–builder describes design–build; the engineer hiring the contractor is not the standard arrangement.
Practice this deckUntimed, one problem at a time, with your progress saved.

Related problems

Keep studying