Problem

A concrete-lined trapezoidal channel has a bottom width of 3.0 m and side slopes of 2 horizontal to 1 vertical on both sides. It carries water at a uniform-flow depth of 1.2 m. The channel bed slope is 0.0016 and Manning's roughness coefficient is .

The flow rate in the channel is most nearly:

  1. 7.3 m³/s
  2. 14.6 m³/s
  3. 19.5 m³/s
  4. 21.7 m³/s

Answer

Show steps

Given

  • Bottom width
  • Side slope (2H : 1V)
  • Flow depth
  • Bed slope , roughness
  • SI units, so

Method 1, step 1: Flow area and wetted perimeter

Each sloping side runs 2 m horizontally for every 1 m of depth, so it spreads out m on each side:

Method 1, step 2: Hydraulic radius

Method 1, step 3: Manning equation

Method 2 (check): Split the section, then Q = VA

Rebuild the area from a rectangle plus two triangles, and each sloping side from its 2.4 m run and 1.2 m rise:

Find the mean velocity from Manning, then multiply by the area:

Both methods give the same result.

Concept

In uniform open-channel flow, gravity pulling the water downslope is balanced by friction on the channel lining. The Manning equation links the flow to the channel shape, roughness and slope.

  • Flow area and wetted perimeter count only the part of the section that is under water.
  • The wetted perimeter is the length of lining in contact with water (bottom plus both sloping sides), not the free surface.
  • Hydraulic radius . In SI units ; in US units .

See Manning's Equation under open-channel flow in the Water Resources section of the NCEES FE Reference Handbook.

Key Formulas

Notation: = flow rate, = Manning roughness, = flow area, = wetted perimeter, = hydraulic radius, = slope of the energy grade line (equal to the bed slope in uniform flow), = horizontal run per unit rise of the side slope.

Common Mistakes

  • (A) 7.3 m³/s: treating the channel as a 3.0 m wide rectangle and ignoring the water over the sloping sides.
  • (C) 19.5 m³/s: taking the wetted perimeter as b + 2y = 5.4 m, i.e. using the depth instead of the sloping side length.
  • (D) 21.7 m³/s: using K = 1.486 (the US customary constant) with SI units.