  • Field dry unit weight γd = γ / (1 + w)113 pcf
  • Relative compaction RC = γd / γd,max95.77% PASS
  • Void ratio e0.491
  • Degree of saturation S63.25%
  • Zero-air-voids γd at this w128.6 pcf

2. Borrow volume and water for a fill

Uses the required compaction and Proctor maximum from section 1. Target water content is usually near optimum.

  • Fill dry unit weight (spec × γd,max)112.1 pcf
  • Borrow dry unit weight106.5 pcf
  • Borrow (bank) volume to excavate526.4 yd³
  • Shrinkage, bank to compacted5.012%
  • Dry soil solids756.7 tons
  • Water to add7,258 gal

Bank volume is the in-place volume at the borrow pit. Loose (trucked) volume is larger again by the soil's swell factor, typically 10 to 30 percent. Add an allowance for waste and overbuild.

Relative Compaction in One Line

Relative compaction is the dry unit weight measured in the field divided by the maximum dry unit weight from the laboratory Proctor test. Field gauges report wet unit weight and water content, so first remove the water:

If RC meets the specification (often 90 or 95 percent) the lift passes. The dry unit weight and phase relationships used here are in the Geotechnical section of the NCEES FE Reference Handbook.

Void Ratio, Saturation and the Zero-Air-Voids Line

The calculator also checks the test against soil phase relations, using the specific gravity of solids Gs:

γw is 62.4 pcf or 9.81 kN/m³. The zero-air-voids unit weight is the densest the soil can possibly be at that water content (S = 100%). A field result above it means a bad reading or the wrong Gs. Near optimum water content, compacted soils are often around 75 to 90 percent saturated. More on these relations in the phase relations lesson.

Worked Example: Field Density Test

A nuclear gauge on a lift of structural fill reads a wet unit weight of 126.0 pcf at 11.5% water content. The modified Proctor gives γd,max = 118.0 pcf at 12.0% optimum. The spec is 95%, and Gs = 2.70. These are the calculator's default US inputs.

At this water content the lift needs a wet unit weight of at least 0.95 × 118.0 × 1.115 = 125.0 pcf to pass. A reading of 124 pcf would fail and need more passes of the roller.

Worked Example: How Much Borrow for a Fill

The same soil will build 500 yd³ of compacted fill at 95%. In the borrow pit it weighs 115 pcf wet at 8% water. The dry weight of soil solids does not change between the pit and the fill, so the volumes scale with dry unit weight:

Trucks carry loose soil, which swells beyond the bank volume, so the number of loads depends on the swell factor. Add a few percent for waste and overbuild. To get the fill volume of a pad or trench in the first place, use the cubic yard calculator. Once a pavement subgrade passes, size the paving with the asphalt calculator.

Proctor Test and Field Methods

The Proctor test compacts soil in a mold at several water contents and plots dry unit weight against water content. The peak is γd,max and the water content there is the optimum. Field density is measured with a nuclear gauge, sand cone or rubber balloon, each giving wet unit weight and water content for the formulas above. These tests are covered in FE Civil laboratory and field tests, and relative compaction problems can show up on the exam. Practice them in the soil mechanics practice deck.

Soil Compaction FAQ

How do you calculate relative compaction?

Convert the field wet unit weight to dry unit weight with γd = γ / (1 + w), then divide by the maximum dry unit weight from the laboratory Proctor test and multiply by 100. A field γd of 113.0 pcf against a Proctor maximum of 118.0 pcf is 95.8 percent.

What relative compaction is required?

Project specifications set it. Common values are 90 percent of modified Proctor (ASTM D1557) for general fill and 95 percent for structural fill, building pads and the top of pavement subgrade. Some specs use standard Proctor (ASTM D698) instead, so check which test the percentage refers to.

What is the difference between standard and modified Proctor?

Modified Proctor uses a heavier hammer and higher drop, about 4.5 times the compaction energy of standard Proctor. It gives a higher maximum dry unit weight at a lower optimum water content, so 95 percent modified is a stricter requirement than 95 percent standard.

How much fill dirt do I need to order after compaction?

Compacted volume times the ratio of the fill dry unit weight to the borrow dry unit weight gives the bank (in-place) volume. Trucks haul loose soil, which swells another 10 to 30 percent, so ask the supplier which volume their price is based on.

Can relative compaction be over 100 percent?

Yes. Heavy rollers can compact soil beyond the laboratory maximum, especially against standard Proctor. A value well above 100 percent can also mean the Proctor curve does not match the soil that was tested, so a new Proctor may be needed.